Minimising disruption during a full electrical inspection at a live manufacturing site

Comprehensive Electrical Installation Condition Report (EICR)
Sector:
Manufacturing and engineering services
Location:
Market Drayton, Shropshire
Project duration:
2 days

Overview

A long-standing client and specialist in the manufacture and regrinding of industrial cutting tools, required a full Electrical Installation Condition Report (EICR). Having supported the business over several years, ARH’s engineers were familiar with the layout, production flow and operational routines. This understanding allowed the inspection to be completed efficiently, with minimal disruption to live operations.

The challenge

The client required a full EICR while maintaining continuous production and workshop activity. The inspection had to be delivered within a two-day window without interrupting tool manufacturing or regrinding processes. This called for detailed planning, coordination with site managers and a controlled approach to testing in live environments.

Our approach

ARH sent two experienced engineers to complete the inspection safely and efficiently, managing access across multiple operational zones while keeping the site fully active.

Key steps included:

  • Strategic scheduling – testing was organised around production hours to avoid downtime.
  • Zonal testing – circuits were isolated selectively to maintain workflow and keep machinery operational.
  • Portable testing equipment – compact, non-intrusive tools were used to verify live circuits safely.
  • Close coordination – regular communication with production and maintenance teams ensured safe access and smooth progress.

The results

  • 100% of electrical installations were tested and reported within the planned two-day timeframe.
  • The inspection was completed with negligible impact on daily operations.
  • The client received a compliant EICR report with practical recommendations for maintenance and future improvements.
“ARH’s engineers were professional, organised, and easy to work with. They completed the EICR in just two days, fitting around our production schedule and ensuring everything ran as normal.”

Facilities Manager