A long-standing client and specialist in the manufacture and regrinding of industrial cutting tools, required a full Electrical Installation Condition Report (EICR). Having supported the business over several years, ARH’s engineers were familiar with the layout, production flow and operational routines. This understanding allowed the inspection to be completed efficiently, with minimal disruption to live operations.
The client required a full EICR while maintaining continuous production and workshop activity. The inspection had to be delivered within a two-day window without interrupting tool manufacturing or regrinding processes. This called for detailed planning, coordination with site managers and a controlled approach to testing in live environments.
ARH sent two experienced engineers to complete the inspection safely and efficiently, managing access across multiple operational zones while keeping the site fully active.
Key steps included: